Please wait, while we are loading the content...
Please wait, while we are loading the content...
| Content Provider | Springer Nature : BioMed Central |
|---|---|
| Author | Yang, Hongjiang Li, Bo Xing, Cong Gao, Shijie Zhu, Wenbiao Xiong, Yang Ren, Xiuzhi Ning, Guangzhi |
| Abstract | Background Osteogenesis imperfecta (OI) is a hereditary genetic disorder characterized by bone fragility and extremity deformities. The surgical management for long-bone fractures and deformities in OI remains a challenge. We aimed to compare clinical outcomes after femoral surgery splinted with the telescopic rod, the plate and screws, the elastic nail and the non-elongating rod in setting of OI. Methods A retrospective cohort study included 783 femoral procedures (mean age 6.00 (interquartile range (IQR) 5.00) years, 335 (42.8%) females) was conducted, and individuals were categorized into four groups according to implants. After verifying comparability among the groups, revision rate and implant survival period were compared among the Sillence types and the same comparison were made among four groups within each Sillence type. The incidence of refractures, deformities, and implant-related complications were also compared among the four groups. Results There were no significant differences in demographic information among the four groups in terms of sex (p = 0.101), laterality (p = 0.587), Sillence type (p = 0.122), and postoperative follow-up period (p = 0.214). In total, children with Sillence type III had the highest revision rate and the shortest implant survival period; children with Sillence type I had the lowest revision rate and the longest implant survival period; and children with Sillence type IV had the revision rate and the implant survival period between those observed in Sillence types I and III. In Sillence types III and IV, the telescopic rod had lower revision rate (III 24.8%; IV 20.9%) compared to the plate (III 97.2%, p<0.001; IV 80.3%, p<0.001), the elastic nail (III 100.0%, p=0.019; IV 73.9%, p<0.001) and the non-elongating rod (III 65.0%, p<0.001; IV46.9%, p<0.001); the median implant survival period of the telescopic rod (III 48.00 (IQR 28.50) months; IV 43.00 (33.00) months) is longer than the plate (III 11.00 (9.00) months, p<0.001; IV 19.00 (20.00) months, p<0.001), the elastic nail (III 45.00 (37.75) months, p=1.000; IV 19.00 (35.00) months, p=0.028) and the non-elongating rod (III 39.00 (31.75) months, p=0.473; IV 38.50 (29.75) months, p=1.000).A similar trend was observed in Sillence type I (p = 0.063, p = 0.003; respectively). In addition, the incidence of refracture (15.5%), deformity (2.8%) and implant-related complications (23.1%) were also statistically lower in the telescopic rod group. Conclusion In our cohort, lower revision rate and longer implant survival period were observed in telescopic rod group. This was mainly due to the significant lower incidence of refracture, deformity and implant-related complications with the use of telescopic rod. |
| Related Links | https://bmcmusculoskeletdisord.biomedcentral.com/counter/pdf/10.1186/s12891-023-06222-2.pdf |
| Ending Page | 9 |
| Page Count | 9 |
| Starting Page | 1 |
| File Format | HTM / HTML |
| ISSN | 14712474 |
| DOI | 10.1186/s12891-023-06222-2 |
| Journal | BMC Musculoskeletal Disorders |
| Issue Number | 1 |
| Volume Number | 24 |
| Language | English |
| Publisher | BioMed Central |
| Publisher Date | 2023-02-09 |
| Access Restriction | Open |
| Subject Keyword | Orthopedics Rehabilitation Rheumatology Sports Medicine Internal Medicine Epidemiology Osteogenesis imperfecta Telescopic rod Implant choice Femoral surgeries |
| Content Type | Text |
| Resource Type | Article |
| Subject | Orthopedics and Sports Medicine Rheumatology |
| Journal Impact Factor | 2.2/2023 |
| 5-Year Journal Impact Factor | 2.6/2023 |
National Digital Library of India (NDLI) is a virtual repository of learning resources which is not just a repository with search/browse facilities but provides a host of services for the learner community. It is sponsored and mentored by Ministry of Education, Government of India, through its National Mission on Education through Information and Communication Technology (NMEICT). Filtered and federated searching is employed to facilitate focused searching so that learners can find the right resource with least effort and in minimum time. NDLI provides user group-specific services such as Examination Preparatory for School and College students and job aspirants. Services for Researchers and general learners are also provided. NDLI is designed to hold content of any language and provides interface support for 10 most widely used Indian languages. It is built to provide support for all academic levels including researchers and life-long learners, all disciplines, all popular forms of access devices and differently-abled learners. It is designed to enable people to learn and prepare from best practices from all over the world and to facilitate researchers to perform inter-linked exploration from multiple sources. It is developed, operated and maintained from Indian Institute of Technology Kharagpur.
Learn more about this project from here.
NDLI is a conglomeration of freely available or institutionally contributed or donated or publisher managed contents. Almost all these contents are hosted and accessed from respective sources. The responsibility for authenticity, relevance, completeness, accuracy, reliability and suitability of these contents rests with the respective organization and NDLI has no responsibility or liability for these. Every effort is made to keep the NDLI portal up and running smoothly unless there are some unavoidable technical issues.
Ministry of Education, through its National Mission on Education through Information and Communication Technology (NMEICT), has sponsored and funded the National Digital Library of India (NDLI) project.
| Sl. | Authority | Responsibilities | Communication Details |
|---|---|---|---|
| 1 | Ministry of Education (GoI), Department of Higher Education |
Sanctioning Authority | https://www.education.gov.in/ict-initiatives |
| 2 | Indian Institute of Technology Kharagpur | Host Institute of the Project: The host institute of the project is responsible for providing infrastructure support and hosting the project | https://www.iitkgp.ac.in |
| 3 | National Digital Library of India Office, Indian Institute of Technology Kharagpur | The administrative and infrastructural headquarters of the project | Dr. B. Sutradhar bsutra@ndl.gov.in |
| 4 | Project PI / Joint PI | Principal Investigator and Joint Principal Investigators of the project |
Dr. B. Sutradhar bsutra@ndl.gov.in Prof. Saswat Chakrabarti will be added soon |
| 5 | Website/Portal (Helpdesk) | Queries regarding NDLI and its services | support@ndl.gov.in |
| 6 | Contents and Copyright Issues | Queries related to content curation and copyright issues | content@ndl.gov.in |
| 7 | National Digital Library of India Club (NDLI Club) | Queries related to NDLI Club formation, support, user awareness program, seminar/symposium, collaboration, social media, promotion, and outreach | clubsupport@ndl.gov.in |
| 8 | Digital Preservation Centre (DPC) | Assistance with digitizing and archiving copyright-free printed books | dpc@ndl.gov.in |
| 9 | IDR Setup or Support | Queries related to establishment and support of Institutional Digital Repository (IDR) and IDR workshops | idr@ndl.gov.in |
|
Loading...
|