Please wait, while we are loading the content...
Please wait, while we are loading the content...
| Content Provider | Springer Nature Link |
|---|---|
| Author | Philippou, Anastassios Bogdanis, Gregory C. Nevill, Alan M. Maridaki, Maria |
| Copyright Year | 2004 |
| Abstract | The aim of this study was to explore and compare the magnitude and time-course of the shift in the angle-force curves obtained from maximal voluntary contractions of the elbow flexors, both before and 4 consecutive days after eccentric and isometric exercise. The maximal isometric force of the elbow flexors of fourteen young male volunteers was measured at five different elbow angles between 50° and 160°. Subjects were then divided into two groups: the eccentric group (ECC, n=7) and the isometric group (ISO, n=7). Subjects in the ECC group performed 50 maximal voluntary eccentric contractions of the elbow flexors on an isokinetic dynamometer (30°.s−1), while subjects in the ISO group performed 50 maximal voluntary isometric muscle contractions with the elbow flexors at a lengthened position. Following the ECC and ISO exercise protocols, maximal isometric force at the five angles, muscle soreness, and the relaxed (RANG) and flexed (FANG) elbow angles were measured at 24 h intervals for 4 days. All results were presented as the mean and standard error, and a quadratic curve was used to model the maximal isometric force data obtained at the five elbow angles. This approach not only allowed us to mathematically describe the angle-force curves and estimate the peak force and optimum angle for peak force generation, but also enabled us to statistically compare the shift of the angle-force curves between and within groups. A large and persistent shift of the angle-force curve towards longer muscle lengths was observed 1 day after eccentric exercise (P<0.01). This resulted in a ~16° shift of the optimum angle for force generation, which remained unchanged for the whole observation period. A smaller but also persistent shift of the angle-force curve was seen after isometric exercise at long muscle length (P<0.05; shift in optimum angle ~5°). ECC exercise caused more muscle damage than ISO exercise, as indicated by the greater changes in RANG and ratings of muscle soreness (P<0.05). It was suggested that the shift in the angle-force curve was proportional to the degree of muscle damage and may be explained by the presence of overstretched sarcomeres that increased in series compliance of the muscle. |
| Starting Page | 237 |
| Ending Page | 244 |
| Page Count | 8 |
| File Format | |
| ISSN | 14396319 |
| Journal | European Journal of Applied Physiology |
| Volume Number | 93 |
| Issue Number | 1 |
| e-ISSN | 14396327 |
| Language | English |
| Publisher | Springer-Verlag |
| Publisher Date | 2004-08-04 |
| Publisher Place | Berlin/Heidelberg |
| Access Restriction | One Nation One Subscription (ONOS) |
| Subject Keyword | Muscle damage Force-length relationship Contractile function Long muscle length |
| Content Type | Text |
| Resource Type | Article |
| Subject | Orthopedics and Sports Medicine Physiology (medical) Public Health, Environmental and Occupational Health Sports Science |
National Digital Library of India (NDLI) is a virtual repository of learning resources which is not just a repository with search/browse facilities but provides a host of services for the learner community. It is sponsored and mentored by Ministry of Education, Government of India, through its National Mission on Education through Information and Communication Technology (NMEICT). Filtered and federated searching is employed to facilitate focused searching so that learners can find the right resource with least effort and in minimum time. NDLI provides user group-specific services such as Examination Preparatory for School and College students and job aspirants. Services for Researchers and general learners are also provided. NDLI is designed to hold content of any language and provides interface support for 10 most widely used Indian languages. It is built to provide support for all academic levels including researchers and life-long learners, all disciplines, all popular forms of access devices and differently-abled learners. It is designed to enable people to learn and prepare from best practices from all over the world and to facilitate researchers to perform inter-linked exploration from multiple sources. It is developed, operated and maintained from Indian Institute of Technology Kharagpur.
Learn more about this project from here.
NDLI is a conglomeration of freely available or institutionally contributed or donated or publisher managed contents. Almost all these contents are hosted and accessed from respective sources. The responsibility for authenticity, relevance, completeness, accuracy, reliability and suitability of these contents rests with the respective organization and NDLI has no responsibility or liability for these. Every effort is made to keep the NDLI portal up and running smoothly unless there are some unavoidable technical issues.
Ministry of Education, through its National Mission on Education through Information and Communication Technology (NMEICT), has sponsored and funded the National Digital Library of India (NDLI) project.
| Sl. | Authority | Responsibilities | Communication Details |
|---|---|---|---|
| 1 | Ministry of Education (GoI), Department of Higher Education |
Sanctioning Authority | https://www.education.gov.in/ict-initiatives |
| 2 | Indian Institute of Technology Kharagpur | Host Institute of the Project: The host institute of the project is responsible for providing infrastructure support and hosting the project | https://www.iitkgp.ac.in |
| 3 | National Digital Library of India Office, Indian Institute of Technology Kharagpur | The administrative and infrastructural headquarters of the project | Dr. B. Sutradhar bsutra@ndl.gov.in |
| 4 | Project PI / Joint PI | Principal Investigator and Joint Principal Investigators of the project |
Dr. B. Sutradhar bsutra@ndl.gov.in Prof. Saswat Chakrabarti will be added soon |
| 5 | Website/Portal (Helpdesk) | Queries regarding NDLI and its services | support@ndl.gov.in |
| 6 | Contents and Copyright Issues | Queries related to content curation and copyright issues | content@ndl.gov.in |
| 7 | National Digital Library of India Club (NDLI Club) | Queries related to NDLI Club formation, support, user awareness program, seminar/symposium, collaboration, social media, promotion, and outreach | clubsupport@ndl.gov.in |
| 8 | Digital Preservation Centre (DPC) | Assistance with digitizing and archiving copyright-free printed books | dpc@ndl.gov.in |
| 9 | IDR Setup or Support | Queries related to establishment and support of Institutional Digital Repository (IDR) and IDR workshops | idr@ndl.gov.in |
|
Loading...
|