Loading...
Please wait, while we are loading the content...
Similar Documents
A time-varying lot sizes approach for the economic lot scheduling problem with returns
| Content Provider | Semantic Scholar |
|---|---|
| Author | Bae, Heechul Moon, Ilkyeong Yun, Won-Young |
| Copyright Year | 2016 |
| Abstract | We consider the economic lot scheduling problem with returns by assuming that each item is returned by a constant rate of demand. The goal is to find production frequencies, production sequences, production times, as well as idle times for several items subject to returns at a single facility. We propose a heu ristic algorithm based on a time-varying (TV) lot sizes approach. The problem is decomposed into two distinct portions: in the first, we find a combinatorial part (production frequencies and sequences) and in the second, we determine a continuous part (production and idle times) in a specific production sequence. We report computational results that show that, in many cases, the proposed TV lot sizes approach with consideration of returns yields a relatively minor error. |
| Starting Page | 3380 |
| Ending Page | 3396 |
| Page Count | 17 |
| File Format | PDF HTM / HTML |
| DOI | 10.1080/00207543.2015.1110633 |
| Volume Number | 54 |
| Alternate Webpage(s) | http://scm.snu.ac.kr/publication/paper/86.pdf |
| Alternate Webpage(s) | https://doi.org/10.1080/00207543.2015.1110633 |
| Language | English |
| Access Restriction | Open |
| Content Type | Text |
| Resource Type | Article |