Loading...
Please wait, while we are loading the content...
Similar Documents
Economic lot and supply scheduling problem: a time-varying lot sizes approach
| Content Provider | Semantic Scholar |
|---|---|
| Author | Bae, Heechul Moon, Ilkyeong Yun, Won-Young |
| Copyright Year | 2014 |
| Abstract | We study the economic lot and supply scheduling problem (ELSSP) that arises in the distribution and manufacturing industries. The ELSSP involves the simultaneous scheduling of end-item production and inbound transportation of input materials over an infinite time horizon to minimise the average costs of inventory, production set-up and transportation. We present a new methodology based on a time-varying lot sizes approach for the ELSSP. We also provide computational experiments showing that the developed algorithm outperforms the existing heuristic for improved integrated scheduling. |
| Starting Page | 2422 |
| Ending Page | 2435 |
| Page Count | 14 |
| File Format | PDF HTM / HTML |
| DOI | 10.1080/00207543.2013.866703 |
| Alternate Webpage(s) | http://scm.snu.ac.kr/publication/paper/70.pdf |
| Alternate Webpage(s) | https://doi.org/10.1080/00207543.2013.866703 |
| Volume Number | 52 |
| Language | English |
| Access Restriction | Open |
| Content Type | Text |
| Resource Type | Article |