Loading...
Please wait, while we are loading the content...
Similar Documents
Development of the decentralized control mathematical model for the potash mine transport system
| Content Provider | Scilit |
|---|---|
| Author | Pivnyak, Gennadiy Tkachov, Victor |
| Copyright Year | 2018 |
| Description | Analysis results of freight flows in potassium pits are presented, giving the base to formulate the freight flows control criteria by defining the relation between input values, freight flow limits are set. Decentralized control provides the increase in reliability and robustness of automation systems. There has been developed a mathematical model of a potassium mine transportation system at decentralized freight traffic control. The data of the model are to be used in the development of the rules of the microprocessor behavior in a decentralized system. Analysis results of freight flows in potassium pits are presented, giving the base to formulate the freight flows control criteria by defining the relation between input values, freight flow limits are set. This chapter explores a mathematical model of a potassium mine transportation system at decentralized freight traffic control. The data of the model are to be used in the development of the rules of the microprocessor behavior in a decentralized system. The potash ore transportation from a mine to a surface is made by means of skip hoists. The special bunker of large capacity common to the whole mine bunker (CWMB) is equipped in the pit-bottom for maintenance of rhythm and uninterrupted operation of rising the ore. The main function of the CWMB is accumulation and further transmission of the potash ore. Under conveyor delivery the ore is transported along the conveyor routes from the excavation sites to the pit-bottom and is dumped into the CWMB. Book Name: Mine Planning and Equipment Selection 2000 |
| Related Links | https://content.taylorfrancis.com/books/download?dac=C2004-0-28217-4&isbn=9780203747124&doi=10.1201/9780203747124-21&format=pdf |
| Ending Page | 120 |
| Page Count | 4 |
| Starting Page | 117 |
| DOI | 10.1201/9780203747124-21 |
| Language | English |
| Publisher | Informa UK Limited |
| Publisher Date | 2018-05-08 |
| Access Restriction | Open |
| Subject Keyword | Book Name: Mine Planning and Equipment Selection 2000 Mining and Mineral Processing Decentralized Control Criteria Freight Flows Mine Transportation Potassium Pits |
| Content Type | Text |
| Resource Type | Chapter |