Loading...
Please wait, while we are loading the content...
Similar Documents
The complex decision of a problem of open-pits excavator-automobile systems reproduction
| Content Provider | Scilit |
|---|---|
| Author | Galiyev, S. Zh. Jaxybayev, A. Kh. Boyandinova, A. A. Lerman, B. D. Gabdullin, T. G. |
| Copyright Year | 2018 |
| Description | Book Name: Mine Planning and Equipment Selection 2000 |
| Abstract | The economic efficiency evaluation of work variants of a mining-transport complex is one of major stages at designing and planning of mining work and in particular at a substantiation of a choice of the basic process equipment. It shows conformity of the chosen mining and transport equipment to accepted transport system, organisation of mining-transport work to planned volumes of taken rock mass. However, as well as all comparative evaluations it is relative and does not reflect a realisation degree of being available potential. In this connection, in the offered approach to an efficiency evaluation of use of the basic process equipment, as additional criteria a parameter of a mining-transport complex productive capacity is accepted. It allows effectively operate of process of productive capacity reproduction of open-pit’s mining-transport systems. In the given work in the plan of an establishment economically expedient productive capacity of the mining enterprise and the control of process of its reproduction on a basis of simulation modelling of mining-transport systems of open-pits (MTSO) work is offered to acquaint with some aspects of scientific-practical work developed by a science centre «Mining technology». The economic efficiency evaluation of work variants of a mining-transport complex is one of major stages at designing and planning of mining work and in particular at a substantiation of a choice of the basic process equipment. The scientific centre developed the structure of economical-mathematical model with the purpose of optimisation and economic evaluation of excavator-automobile systems works of open-pits. In the offered approach to an efficiency evaluation of use of the basic process equipment, as additional criteria a parameter of a mining-transport complex productive capacity is accepted. It allows effectively operate of process of productive capacity reproduction of open-pit's mining-transport systems. The spent researches confirm the statements that productive capacity of open-pit is defined not only such factors, as front of mining work, transport's and excavator's park, but also in an essential degree depends from organisational and economic factors. |
| Related Links | https://content.taylorfrancis.com/books/download?dac=C2004-0-28217-4&isbn=9780203747124&doi=10.1201/9780203747124-107&format=pdf |
| Ending Page | 567 |
| Page Count | 5 |
| Starting Page | 563 |
| DOI | 10.1201/9780203747124-107 |
| Language | English |
| Publisher | Informa UK Limited |
| Publisher Date | 2018-05-08 |
| Access Restriction | Open |
| Subject Keyword | Book Name: Mine Planning and Equipment Selection 2000 Mining and Mineral Processing Efficiency Evaluation Mining Transport Excavator Automobile Systems Basic Process Equipment |
| Content Type | Text |
| Resource Type | Chapter |