Loading...
Please wait, while we are loading the content...
Similar Documents
Design and construction of pile tip and pile lateral bored grouting
| Content Provider | Scilit |
|---|---|
| Copyright Year | 2016 |
| Description | The basic structure of this project is the pile raft foundation. The frame core-tube system is applied in the basement of the main tower; concrete frame shear wall structure is applied in the basement of the podium building; and the concrete frame structure is employed in the rest basements. To the south, the North Tower is used for the steel reinforced concrete frame and reinforced concrete core wall cantilever truss + + belt truss structure, foundation frame structure. Book Name: Advanced Materials, Structures and Mechanical Engineering |
| Related Links | https://api.taylorfrancis.com/content/chapters/edit/download?identifierName=doi&identifierValue=10.1201/b19693-20&type=chapterpdf |
| DOI | 10.1201/b19693-20 |
| Language | English |
| Publisher | Informa UK Limited |
| Publisher Date | 2016-04-14 |
| Access Restriction | Open |
| Subject Keyword | Book Name: Advanced Materials, Structures and Mechanical Engineering Environmental Engineering Structure Building Reinforced Cantilever Podium |
| Content Type | Text |
| Resource Type | Chapter |