Please wait, while we are loading the content...
Please wait, while we are loading the content...
| Content Provider | IEEE Xplore Digital Library |
|---|---|
| Author | Rothleder, M. |
| Copyright Year | 2009 |
| Description | Author affiliation: California ISO, Folsom, USA (Rothleder, M.) |
| Abstract | The CAISO is completing the implementation of it Market Redesign and Technology Upgrade (MRTU). Currently, the Ancillary Services at the CAISO is approximately a $300 million annual market. In conjunction with the Market Redesign, the CAISO is implementing a co-optimization of Energy subject to Transmission Constraints and Ancillary Services subject to resource constraints. Prior to MRTU, the CAISO procured Ancillary Services in the Day-Ahead Market sequentially after allocating transmission using a Ration Buyer approach. In addition the CAISO procures the incremental Ancillary Service needs in the Hour-Ahead market. There are currently three Ancillary Services that the CAISO procures via the market: 1) Regulation, 2) Spinning-Reserve (Available in 10 minutes for synchronized resources), 3) Non-Spinning Reserve (Available in 10 minutes). After MRTU is implemented, 100% of forecasted required reserves will be procured simultaneously in Day-Ahead Market with Energy. Any additional Ancillary Service required in Real-Time will be procured on a 15 minute interval basis simultaneously when making unit commitment decisions. Energy from regulation will be dispatched by Automated Generation Control (AGC) on a 4 second basis. Energy from procured Spinning and Non-Spinning reserves may be dispatched on a 5 minute basis if they are available if they are flagged as non-contingent. Spinning and Non-Spinning reserves that are flagged as contingency only are available to energy dispatch in case of a contingency event. Regional Ancillary Service constraints will be enforced to assure a minimum or maximum regional requirements are satisfied. In addition the import of Ancillary Services will compete with Energy for import intertie capacity. In order to assure that the highest quality service is procured if economic appropriate, the Regulation reserves can substitute for Spinning or Non-Spinning reserves. Spinning reserve can substitute for Non-Spinning reserves. As a result of this ability to substitute, the higher quality service in a region should be greater than or equal to the lower quality services in the same region. As result of the simultaneous optimization of the Energy and Ancillary Services, the Ancillary Price will reflect the marginal cost of the services as well as any lost opportunity cost as a result of having to not dispatching otherwise economic energy to meet the Ancillary Service requirements. The CAISO is considering introducing a 30 minute reserve product in the future to address the need to respond to contingency overloads. Other services such as Reactive Support and Black-Start capability are not currently procured via spot market mechanisms but rather procured as a result of Reliability Must Run agreements. The presentation we will provide a status update of implementation of the Energy and Ancillary Service co-optimization. We intend to present high level information how the Ancillary Service constraint is formulated. In addition, we will provide a summary of experience with the new Ancillary Service procurement methodology during Market Simulation. Lastly, we will provide insight into areas in which Ancillary Service procurement can be further enhanced in the future better ensure deliverability of such reserves from both a transmission constraint and resource ramping constraint perspective. |
| Starting Page | 1 |
| Ending Page | 2 |
| File Size | 259035 |
| Page Count | 2 |
| File Format | |
| ISBN | 9781424438105 |
| DOI | 10.1109/PSCE.2009.4840088 |
| Language | English |
| Publisher | Institute of Electrical and Electronics Engineers, Inc. (IEEE) |
| Publisher Date | 2009-03-15 |
| Publisher Place | USA |
| Access Restriction | Subscribed |
| Rights Holder | Institute of Electrical and Electronics Engineers, Inc. (IEEE) |
| Subject Keyword | Procurement Load forecasting ISO Power generation economics Automatic generation control Economic forecasting Cost function Dispatching Spinning |
| Content Type | Text |
| Resource Type | Article |
National Digital Library of India (NDLI) is a virtual repository of learning resources which is not just a repository with search/browse facilities but provides a host of services for the learner community. It is sponsored and mentored by Ministry of Education, Government of India, through its National Mission on Education through Information and Communication Technology (NMEICT). Filtered and federated searching is employed to facilitate focused searching so that learners can find the right resource with least effort and in minimum time. NDLI provides user group-specific services such as Examination Preparatory for School and College students and job aspirants. Services for Researchers and general learners are also provided. NDLI is designed to hold content of any language and provides interface support for 10 most widely used Indian languages. It is built to provide support for all academic levels including researchers and life-long learners, all disciplines, all popular forms of access devices and differently-abled learners. It is designed to enable people to learn and prepare from best practices from all over the world and to facilitate researchers to perform inter-linked exploration from multiple sources. It is developed, operated and maintained from Indian Institute of Technology Kharagpur.
Learn more about this project from here.
NDLI is a conglomeration of freely available or institutionally contributed or donated or publisher managed contents. Almost all these contents are hosted and accessed from respective sources. The responsibility for authenticity, relevance, completeness, accuracy, reliability and suitability of these contents rests with the respective organization and NDLI has no responsibility or liability for these. Every effort is made to keep the NDLI portal up and running smoothly unless there are some unavoidable technical issues.
Ministry of Education, through its National Mission on Education through Information and Communication Technology (NMEICT), has sponsored and funded the National Digital Library of India (NDLI) project.
| Sl. | Authority | Responsibilities | Communication Details |
|---|---|---|---|
| 1 | Ministry of Education (GoI), Department of Higher Education |
Sanctioning Authority | https://www.education.gov.in/ict-initiatives |
| 2 | Indian Institute of Technology Kharagpur | Host Institute of the Project: The host institute of the project is responsible for providing infrastructure support and hosting the project | https://www.iitkgp.ac.in |
| 3 | National Digital Library of India Office, Indian Institute of Technology Kharagpur | The administrative and infrastructural headquarters of the project | Dr. B. Sutradhar bsutra@ndl.gov.in |
| 4 | Project PI / Joint PI | Principal Investigator and Joint Principal Investigators of the project |
Dr. B. Sutradhar bsutra@ndl.gov.in Prof. Saswat Chakrabarti will be added soon |
| 5 | Website/Portal (Helpdesk) | Queries regarding NDLI and its services | support@ndl.gov.in |
| 6 | Contents and Copyright Issues | Queries related to content curation and copyright issues | content@ndl.gov.in |
| 7 | National Digital Library of India Club (NDLI Club) | Queries related to NDLI Club formation, support, user awareness program, seminar/symposium, collaboration, social media, promotion, and outreach | clubsupport@ndl.gov.in |
| 8 | Digital Preservation Centre (DPC) | Assistance with digitizing and archiving copyright-free printed books | dpc@ndl.gov.in |
| 9 | IDR Setup or Support | Queries related to establishment and support of Institutional Digital Repository (IDR) and IDR workshops | idr@ndl.gov.in |
|
Loading...
|