| Content Provider | The American Society of Mechanical Engineers (ASME) Digital Collection |
|---|---|
| Author | Zhao, Yongliang Wang, Chaoyang Liu, Ming Chong, Daotong Yan, Junjie |
| Copyright Year | 2018 |
| Abstract | Increasing the share of intermittent renewable energy sources in a power system poses challenges in terms of increased net load variability and maintaining grid stability and security. Operational flexibility of coal-fired power plants in China has played an essential and promising role in accommodating these nonequilibrium in the power grid. In the study, focusing on condensate throttling coupled with thermal storage tank measures, dynamic simulations of an entire 660 MW supercritical coal-fired power plant were developed via the GSE software. Then, the dynamic characteristics of main thermodynamic parameters and output power were described and compared, and operational flexibility performances of these measures were discussed. It turns out that: when condensate water flowrate decreases, the largest power ramp rate, power capacity, and energy capacity are 12.68 MW min−1, 12.76 MW, and 1084.70 MJ, respectively, and when condensate water flowrate increases, the largest power ramp rate, power capacity, and energy capacity are −5.49 MW min−1, −5.65 MW, and −695.94 MJ, respectively, which means condensate throttling without thermal storage tank measure is more suitable for power-up regulation than power-down regulation, but the shortest duration time is 130 s, which will restrict the operational flexibility regulation. However, coupling with thermal storage tanks, the deaerator water level can maintain a longer time. Meanwhile, at feedwater bypass 60% coupled with thermal storage tank, the largest power ramp rate, power capacity, and energy capacity are −3.62 MW min−1, −3.81 MW, and −897.31 MJ, respectively, and at condensate water bypass 60% coupled with thermal storage tank, the largest power ramp rate, power capacity, and energy capacity are 7.74 MW min−1, 7.88 MW, and 1829.38 MJ, respectively, and these parameter values are greater than condensate water flowrate directly increases or decreases 60%, which means condensate throttling coupling with thermal storage tanks can improve operational flexibility performances. The work is expected to reveal the performance parameters and strategies to provide detailed guidance of using turbine energy storage to improve operational flexibility of the coal-fired power plants. |
| Sponsorship | Power Division Advanced Energy Systems Division Solar Energy Division Nuclear Engineering Division |
| File Format | |
| ISBN | 9780791851401 |
| DOI | 10.1115/POWER2018-7176 |
| Volume Number | Volume 2: Heat Exchanger Technologies; Plant Performance; Thermal Hydraulics and Computational Fluid Dynamics; Water Management for Power Systems; Student Competition |
| Conference Proceedings | ASME 2018 Power Conference collocated with the ASME 2018 12th International Conference on Energy Sustainability and the ASME 2018 Nuclear Forum |
| Language | English |
| Publisher Date | 2018-06-24 |
| Publisher Place | Lake Buena Vista, Florida, USA |
| Access Restriction | Subscribed |
| Subject Keyword | Water Stability Computer software Thermal energy storage Power grids Security Stress Renewable energy sources Condensed matter Simulation Power systems (machinery) China Coal Feedwater Power stations Engineering simulation Turbines Energy storage |
| Content Type | Text |
| Resource Type | Article |
National Digital Library of India (NDLI) is a virtual repository of learning resources which is not just a repository with search/browse facilities but provides a host of services for the learner community. It is sponsored and mentored by Ministry of Education, Government of India, through its National Mission on Education through Information and Communication Technology (NMEICT). Filtered and federated searching is employed to facilitate focused searching so that learners can find the right resource with least effort and in minimum time. NDLI provides user group-specific services such as Examination Preparatory for School and College students and job aspirants. Services for Researchers and general learners are also provided. NDLI is designed to hold content of any language and provides interface support for 10 most widely used Indian languages. It is built to provide support for all academic levels including researchers and life-long learners, all disciplines, all popular forms of access devices and differently-abled learners. It is designed to enable people to learn and prepare from best practices from all over the world and to facilitate researchers to perform inter-linked exploration from multiple sources. It is developed, operated and maintained from Indian Institute of Technology Kharagpur.
Learn more about this project from here.
NDLI is a conglomeration of freely available or institutionally contributed or donated or publisher managed contents. Almost all these contents are hosted and accessed from respective sources. The responsibility for authenticity, relevance, completeness, accuracy, reliability and suitability of these contents rests with the respective organization and NDLI has no responsibility or liability for these. Every effort is made to keep the NDLI portal up and running smoothly unless there are some unavoidable technical issues.
Ministry of Education, through its National Mission on Education through Information and Communication Technology (NMEICT), has sponsored and funded the National Digital Library of India (NDLI) project.
| Sl. | Authority | Responsibilities | Communication Details |
|---|---|---|---|
| 1 | Ministry of Education (GoI), Department of Higher Education |
Sanctioning Authority | https://www.education.gov.in/ict-initiatives |
| 2 | Indian Institute of Technology Kharagpur | Host Institute of the Project: The host institute of the project is responsible for providing infrastructure support and hosting the project | https://www.iitkgp.ac.in |
| 3 | National Digital Library of India Office, Indian Institute of Technology Kharagpur | The administrative and infrastructural headquarters of the project | Dr. B. Sutradhar bsutra@ndl.gov.in |
| 4 | Project PI / Joint PI | Principal Investigator and Joint Principal Investigators of the project |
Dr. B. Sutradhar bsutra@ndl.gov.in Prof. Saswat Chakrabarti will be added soon |
| 5 | Website/Portal (Helpdesk) | Queries regarding NDLI and its services | support@ndl.gov.in |
| 6 | Contents and Copyright Issues | Queries related to content curation and copyright issues | content@ndl.gov.in |
| 7 | National Digital Library of India Club (NDLI Club) | Queries related to NDLI Club formation, support, user awareness program, seminar/symposium, collaboration, social media, promotion, and outreach | clubsupport@ndl.gov.in |
| 8 | Digital Preservation Centre (DPC) | Assistance with digitizing and archiving copyright-free printed books | dpc@ndl.gov.in |
| 9 | IDR Setup or Support | Queries related to establishment and support of Institutional Digital Repository (IDR) and IDR workshops | idr@ndl.gov.in |
|
Loading...
|