Loading...
Please wait, while we are loading the content...
Show Me the Money
Content Provider | TeachEngineering: STEM curriculum for K-12 |
---|---|
Author | Goode, Jonathan S. Friedrichsen, Joe Mach, Natalie Valenti, Christopher Lander, Denali Carlson, Denise W. Zarske, Malinda Schaefer |
Copyright Year | 2007 |
Description | Students learn about the major factors that comprise the design and construction cost of a modern bridge. Students learn about the components that go into estimating the total cost, including expenses for site investigation, design, materials, equipment, labor and construction oversight, as well as the tradeoff between a design and its cost. Students learn about the major factors that comprise the design and construction cost of a modern bridge. Before a bridge design is completed, engineers provide overall cost estimates for construction of the bridge. Students learn about the components that go into estimating the total cost, including expenses for site investigation, design, materials, equipment, labor and construction oversight, as well as the tradeoff between a design and its cost. |
Language | English |
Access Restriction | Open |
Rights Holder | Regents of The University of Colorado |
Subject Keyword | Physical Science Optimal Design Estimate Bridge Estimating |
Content Type | Text |
Time Required | PT15M |
Education Level | Class VI Class VII Class VIII |
Resource Type | Notes |
Subject | Physics |