Please wait, while we are loading the content...
Please wait, while we are loading the content...
| Content Provider | Springer Nature : BioMed Central |
|---|---|
| Author | Zhang, Yun Huang, Yuling Ding, Shenggou Yuan, Xingxing Shu, Yuxian Liang, Jinhui Mao, Qingfeng Jiang, Chunling Li, Jingao |
| Abstract | Background To compare the dosimetric, normal tissue complication probability (NTCP), secondary cancer complication probabilities (SCCP), and excess absolute risk (EAR) differences of volumetric modulated arc therapy (VMAT) and intensity-modulated radiation therapy (IMRT) for left-sided breast cancer after mastectomy. Methods and materials Thirty patients with left-sided breast cancer treated with post-mastectomy radiation therapy (PMRT) were randomly enrolled in this study. Both IMRT and VMAT treatment plans were created for each patient. Planning target volume (PTV) doses for the chest wall and internal mammary nodes, PTV1, and PTV of the supraclavicular nodes, PTV2, of 50 Gy were prescribed in 25 fractions. The plans were evaluated based on PTV1 and PTV2 coverage, homogeneity index (HI), conformity index, conformity number (CN), dose to organs at risk, NTCP, SCCP, EAR, number of monitors units, and beam delivery time. Results VMAT resulted in more homogeneous chest wall coverage than did IMRT. The percent volume of PTV1 that received the prescribed dose of VMRT and IMRT was 95.9 ± 1.2% and 94.5 ± 1.6%, respectively (p < 0.001). The HI was 0.11 ± 0.01 for VMAT and 0.12 ± 0.02 for IMRT, respectively (p = 0.001). The VMAT plan had better conformity (CN: 0.84 ± 0.02 vs. 0.78 ± 0.04, p < 0.001) in PTV compared with IMRT. As opposed to IMRT plans, VMAT delivered a lower mean dose to the ipsilateral lung (11.5 Gy vs 12.6 Gy) and heart (5.2 Gy vs 6.0 Gy) and significantly reduced the V5, V10, V20, V30, and V40 of the ipsilateral lung and heart; only the differences in V5 of the ipsilateral lung did not reach statistical significance (p = 0.409). Although the volume of the ipsilateral lung and heart encompassed by the 2.5 Gy isodose line (V2.5) was increased by 6.7% and 7.7% (p < 0.001, p = 0.002), the NTCP was decreased by 0.8% and 0.6%, and SCCP and EAR were decreased by 1.9% and 0.1% for the ipsilateral lung. No significant differences were observed in the contralateral lung/breast V2.5, V5, V10, V20, mean dose, SCCP, and EAR. Finally, VMAT reduced the number of monitor units by 31.5% and the treatment time by 71.4%, as compared with IMRT. Conclusions Compared with IMRT, VMAT is the optimal technique for PMRT patients with left-sided breast cancer due to better target coverage, a lower dose delivered, NTCP, SCCP, and EAR to the ipsilateral lung and heart, similar doses delivered to the contralateral lung and breast, fewer monitor units and a shorter delivery time. |
| Related Links | https://ro-journal.biomedcentral.com/counter/pdf/10.1186/s13014-021-01895-2.pdf |
| Ending Page | 11 |
| Page Count | 11 |
| Starting Page | 1 |
| File Format | HTM / HTML |
| DOI | 10.1186/s13014-021-01895-2 |
| Journal | Radiation Oncology |
| Issue Number | 1 |
| Volume Number | 16 |
| Language | English |
| Publisher | BioMed Central |
| Publisher Date | 2021-09-06 |
| Access Restriction | Open |
| Subject Keyword | Cancer Research Oncology Radiotherapy Imaging Radiology Left-sided breast cancer Post-mastectomy radiotherapy VMAT Radiation dosimetry Normal tissue complication probability Secondary cancer complication probabilities Excess absolute risk |
| Content Type | Text |
| Resource Type | Article |
| Subject | Radiology, Nuclear Medicine and Imaging Oncology |
| Journal Impact Factor | 3.3/2023 |
| 5-Year Journal Impact Factor | 3.6/2023 |
National Digital Library of India (NDLI) is a virtual repository of learning resources which is not just a repository with search/browse facilities but provides a host of services for the learner community. It is sponsored and mentored by Ministry of Education, Government of India, through its National Mission on Education through Information and Communication Technology (NMEICT). Filtered and federated searching is employed to facilitate focused searching so that learners can find the right resource with least effort and in minimum time. NDLI provides user group-specific services such as Examination Preparatory for School and College students and job aspirants. Services for Researchers and general learners are also provided. NDLI is designed to hold content of any language and provides interface support for 10 most widely used Indian languages. It is built to provide support for all academic levels including researchers and life-long learners, all disciplines, all popular forms of access devices and differently-abled learners. It is designed to enable people to learn and prepare from best practices from all over the world and to facilitate researchers to perform inter-linked exploration from multiple sources. It is developed, operated and maintained from Indian Institute of Technology Kharagpur.
Learn more about this project from here.
NDLI is a conglomeration of freely available or institutionally contributed or donated or publisher managed contents. Almost all these contents are hosted and accessed from respective sources. The responsibility for authenticity, relevance, completeness, accuracy, reliability and suitability of these contents rests with the respective organization and NDLI has no responsibility or liability for these. Every effort is made to keep the NDLI portal up and running smoothly unless there are some unavoidable technical issues.
Ministry of Education, through its National Mission on Education through Information and Communication Technology (NMEICT), has sponsored and funded the National Digital Library of India (NDLI) project.
| Sl. | Authority | Responsibilities | Communication Details |
|---|---|---|---|
| 1 | Ministry of Education (GoI), Department of Higher Education |
Sanctioning Authority | https://www.education.gov.in/ict-initiatives |
| 2 | Indian Institute of Technology Kharagpur | Host Institute of the Project: The host institute of the project is responsible for providing infrastructure support and hosting the project | https://www.iitkgp.ac.in |
| 3 | National Digital Library of India Office, Indian Institute of Technology Kharagpur | The administrative and infrastructural headquarters of the project | Dr. B. Sutradhar bsutra@ndl.gov.in |
| 4 | Project PI / Joint PI | Principal Investigator and Joint Principal Investigators of the project |
Dr. B. Sutradhar bsutra@ndl.gov.in Prof. Saswat Chakrabarti will be added soon |
| 5 | Website/Portal (Helpdesk) | Queries regarding NDLI and its services | support@ndl.gov.in |
| 6 | Contents and Copyright Issues | Queries related to content curation and copyright issues | content@ndl.gov.in |
| 7 | National Digital Library of India Club (NDLI Club) | Queries related to NDLI Club formation, support, user awareness program, seminar/symposium, collaboration, social media, promotion, and outreach | clubsupport@ndl.gov.in |
| 8 | Digital Preservation Centre (DPC) | Assistance with digitizing and archiving copyright-free printed books | dpc@ndl.gov.in |
| 9 | IDR Setup or Support | Queries related to establishment and support of Institutional Digital Repository (IDR) and IDR workshops | idr@ndl.gov.in |
|
Loading...
|