Loading...
Please wait, while we are loading the content...
Similar Documents
Expected Critical Path Lengths in PERT Networks
| Content Provider | Semantic Scholar |
|---|---|
| Author | Fulkerson, D. Ray |
| Copyright Year | 1962 |
| Abstract | A method of obtaining a fairly good lower approximation to the expected duration time of a project whose individual job times are discrete random variables is described. It is assumed that jobs that immediately precede any given job may have a joint distribution of times, with independence between immediate predecessors of different jobs. The method provides an estimate that is usually much better, and never worse, than the one obtained by replacing each random job time by its expected value. An application to expected minimal path lengths in networks whose arc lengths are random variables is discussed. |
| Starting Page | 808 |
| Ending Page | 817 |
| Page Count | 10 |
| File Format | PDF HTM / HTML |
| DOI | 10.1287/opre.10.6.808 |
| Volume Number | 10 |
| Alternate Webpage(s) | http://www.dtic.mil/dtic/tr/fulltext/u2/274597.pdf |
| Alternate Webpage(s) | https://doi.org/10.1287/opre.10.6.808 |
| Language | English |
| Access Restriction | Open |
| Content Type | Text |
| Resource Type | Article |