Loading...
Please wait, while we are loading the content...
Similar Documents
Causes of Delays in Construction Projects in Turkey
| Content Provider | Semantic Scholar |
|---|---|
| Author | Kazaz, Aynur Ulubeyli, Serdar Tuncbilekli, Nihan Avcioglu |
| Copyright Year | 2012 |
| Abstract | Abstract In both developing and industrialized countries, deviation from a planned time schedule is one of the most frequently encountered problems in construction investments. Various factors faced with during construction period prevent systematic flow of work, which causes time-based anomalies as a conclusion. Considering the vital importance of the construction industry on the macro-economic structure of a country, it is inevitable to be aware of considerable effect of the timely completion on the allocated project budget. In this study, causes of time extensions in the Turkish construction industry and levels of their importance were examined together. In total, 34 factors affecting project duration were taken into account. A questionnaire survey, including these factors, was then applied to 71 construction companies in Turkey, and the outcomes were evaluated by means of statistical analyses. According to the results, “design and material changes” was found to be the most predominant factor, followed... |
| Starting Page | 426 |
| Ending Page | 435 |
| Page Count | 10 |
| File Format | PDF HTM / HTML |
| DOI | 10.3846/13923730.2012.698913 |
| Volume Number | 18 |
| Alternate Webpage(s) | https://journals.vgtu.lt/index.php/JCEM/article/download/4467/3804 |
| Alternate Webpage(s) | https://doi.org/10.3846/13923730.2012.698913 |
| Language | English |
| Access Restriction | Open |
| Content Type | Text |
| Resource Type | Article |