Loading...
Please wait, while we are loading the content...
Similar Documents
Planning for Shield Driven Double Track Subway Tunnel of Box Shape
| Content Provider | Semantic Scholar |
|---|---|
| Author | Nakamura, Haruki Furukawa, Makoto Nakao, Takashi |
| Copyright Year | 2003 |
| Abstract | Construction has commenced on the world’s first shield driven double track subway tunnel of rectangular shape for the Kyoto Municipal Subway. Full-scale loading tests were performed on lining segments to confirm the adequacy of their design. Also, as a method by which a rectangular cross section can be excavated, manufacturing is in progress on a “Wagging Cutter Shield,” which is equipped with rotating cutters that perform oscillating movement. This paper presents a report on the overall planning and the tests that were performed in the process of planning. |
| File Format | PDF HTM / HTML |
| Alternate Webpage(s) | http://english.shield-method.gr.jp/wp/wp-content/uploads/wc_04.pdf |
| Language | English |
| Access Restriction | Open |
| Content Type | Text |
| Resource Type | Article |