Loading...
Please wait, while we are loading the content...
Forecasting of Utility Cost in a Deregulated Electricity Market by Using Locational Marginal Pricing
| Content Provider | Semantic Scholar |
|---|---|
| Author | Mohanapriya, T. K. Manikandan, T. R. Venkatesan, T. |
| Copyright Year | 2015 |
| Abstract | In the deregulated electricity market bidding contest is the major operation. Prices obtained from the result of bidding strategy is essential, since all market participants do not be familiar with the accurate assessment of future prices in their decision-making process. Locational Marginal Pricing (LMP) obtains from the Optimal Power Flow problem gives the economic value of electrical energy at each location. Proposed method is based on lossless DC Optimal Power Flow. To solve this LMP problem optimization based Linear Programming (LP) approach has been implemented. In this paper LMP values with transmission, line outage and generator outage constraints are studied. IEEE 14 and IEEE 30 bus systems are used as a test system in this paper. |
| File Format | PDF HTM / HTML |
| Alternate Webpage(s) | http://www.iaescore.com/journals/index.php/IJEECS/article/download/1446/916 |
| Language | English |
| Access Restriction | Open |
| Subject Keyword | Darknet market Decision Making Deoxycytidine Deregulation Downtime Electricity Entity Name Part Qualifier - adopted Flow network Frame (physical object) HL7PublishingSubSection |
| Content Type | Text |
| Resource Type | Article |