Ingeniería conceptual básica y de detalle y simulación de la línea de producción de Cal con una capacidad de 40 t /día para la empresa Andec S.A.
| Content Provider | Semantic Scholar |
|---|---|
| Author | Lara, López Raúl, Luis |
| Copyright Year | 2015 |
| Abstract | In order to obtain good quality steel, it is required quicklime that meets the needed parameters in the foundry process. To obtain quicklime with the required conditions, it is necessary to count with a plant that provides lime with the desired grain size and percentages of calcium oxidize. To meet these characteristics of quicklime, it must go through two processes: crushing and calcination. In the first process, it is obtained the quicklime of the required grain size, so that in the calcination process it can be obtained the quicklime with the desired characteristics. For the correct functioning of the crushing and calcination processes, it must be supplied electric power, potable water, fuel feed, and pipe selection, all of which were made in this project. As it is a funding project, it is fundamental to ensure that capital recovery is made in a minimum period, which can be achieved through an accurate selection of machinery, secondary equipment, raw material suppliers, transportation material, and by optimizing the deliveries of both raw material and the finished product to the main plant ANDEC S.A. The distribution of the plant was made through the Muther method, optimizing times and movements. The recovery process of this project is less than 5 years; therefore, it is a profitable project for the sponsor company. |
| File Format | PDF HTM / HTML |
| Alternate Webpage(s) | http://repositorio.espe.edu.ec/bitstream/21000/11163/2/T-ESPE-048937-R.pdf |
| Language | English |
| Access Restriction | Open |
| Content Type | Text |
| Resource Type | Article |