Loading...
Please wait, while we are loading the content...
Modernización del sistema de control de una grúa porta-contenedores STS.
| Content Provider | Semantic Scholar |
|---|---|
| Author | Porta, Bou Álvaro, Jorge Rojo |
| Copyright Year | 2018 |
| Abstract | The project is based on the modernization of the control system of an STS container crane (ship to dock). The main reason for the improvements to be made is that the old system uses an obsolete communications protocol. It is desired to make a migration of the General Electric PLC from the crane to a Siemens PLC, to replace the decentralized periphery of General Electric by Siemens periphery modules, and to establish the PLC communication of the crane with the existing General Electric drives (DC Drives). A preliminary study and a simplified modeling of the different alternatives will be carried out and then the most appropriate option will be chosen, to finally present the final design of the structure. PALABRAS CLAVE Accionamientos, bus de comunicaciones, sistema de control, obsoleto, modernización |
| File Format | PDF HTM / HTML |
| Alternate Webpage(s) | https://riunet.upv.es/bitstream/handle/10251/106789/BOU%20-%20Modernizaci%C3%B3n%20del%20sistema%20de%20control%20de%20una%20gr%C3%BAa%20porta-contenedores%20STS..pdf?isAllowed=y&sequence=1 |
| Language | English |
| Access Restriction | Open |
| Content Type | Text |
| Resource Type | Article |