Loading...
Please wait, while we are loading the content...
Similar Documents
Commissioning and Initial Operation of the Isotope Production Facility at the Los Alamos Neutron Science Center (lansce)
| Content Provider | Semantic Scholar |
|---|---|
| Author | Johnson, K. F. Alvestad, H. W. Barkley, Walter C. Barlow, Deborah L. Barr, Dean Bennett, Grover Andrew Bitteker, Leo J. Boedeker, Wolfgang Borden, Michael J. Cardón, Raúl Carr, Gary Casados, J. L. Cohen, Seth Cordova, James F. Fresquez, Mark R. Gallegos, Flores Gilpatrick, John Douglas Gonzales, F. Gorman, F. W. Gulley, M. Heaton, Rob Henderson, Derek W. Ireland, David R. Jacobson, E. G. Johns, Grace Kersteins, D. Maestas, Andrea Martínez, Diego Luna Martínez, Gabriela Martinez, Julio Martínez, Marcos Pita Merl, Richard Merrill, Jenny B. Meyer, B. Milder, M. Morgan, E. A. Nortier, Meiring Nortier Olivas, Felix R. Oothoudt, Michael A. Pence, T. D. Peterson, E. Pillai, C. Romero, Frank Patrick Rose, Coralie B. Rybarcyk, Larry Sánchez, Guadalupe Sandoval, J. O. Blanco Schaller, Stefan Shelley, Fred M. Shurter, R. B. Sommer, Wijb Stettler, Matthew Stockton, Jim Sturrock, J. Tomei, Tony L. Valdez, F. Walstrom, Paige Wanco, P. Wilmarth, J. |
| Copyright Year | 2004 |
| Abstract | The recently completed 100-MeV H + Isotope Production Facility (IPF) at the LANSCE will provide radioisotopes for medical research and diagnosis, for basic research and for commercial use. A change to the LANSCE accelerator facility allowed for the installation of the IPF. Three components make up the LANSCE accelerator: an injector that accelerates the H+ beam to 750-KeV, a drift-tube linac (DTL) that increases the beam energy to 100-MeV, and a side-coupled cavity linac (SCCL) that accelerates the beam to 800-MeV. The transition region, a space between the DTL and the SCCL, was modified to permit the insertion of a kicker magnet (23 o kick angle) for the purpose of extracting a portion of the 100-MeV H + beam. A new beam line was installed to transport the extracted H+ beam to the radioisotope production target chamber. This paper will describe the commissioning and initial operating experiences of IPF. |
| File Format | PDF HTM / HTML |
| Alternate Webpage(s) | http://epaper.kek.jp/e04/PAPERS/THPLT153.PDF |
| Alternate Webpage(s) | http://accelconf.web.cern.ch/AccelConf/e04/PAPERS/THPLT153.PDF |
| Language | English |
| Access Restriction | Open |
| Content Type | Text |
| Resource Type | Article |