Loading...
Please wait, while we are loading the content...
Similar Documents
20 25 4 4 8 12 16 20 3 3 6 9 12 15 2 2 4 6 9 10 1 1 2 3 4 5 1 2 3 4 5 Severity
| Content Provider | Semantic Scholar |
|---|---|
| Author | Balfe, Nora Leva, Maria Chiara Ciarapica-Alunni, C. Mahoney, S. O’ |
| Copyright Year | 2018 |
| Abstract | Safe and successful completion of complex projects in industrial environments requires careful planning and collaboration of different stakeholders. This paper presents the integration of three methods (task analysis, safety analysis, and project optimisation) to apply a holistic approach to complex project planning. The attributes and limitations of the separate elements are discussed, and a case study applying the integrated methodology is presented. The results from the case studies indicate that significant benefits in terms of time, cost and safety can be achieved through the application of the integrated methodology. 2016 Elsevier Ltd. All rights reserved. |
| File Format | PDF HTM / HTML |
| Alternate Webpage(s) | https://arrow.dit.ie/cgi/viewcontent.cgi?article=1026&context=engschmanart |
| Language | English |
| Access Restriction | Open |
| Content Type | Text |
| Resource Type | Article |