Please wait, while we are loading the content...
Please wait, while we are loading the content...
| Content Provider | PubMed Central |
|---|---|
| Author | Hammond, G. R. Ridge, R. M. |
| Abstract | 1. Isometric twitch responses of single motor units in snake costocutaneous muscle have been recorded before and after conditioning tetanic stimulation. 2. Most units showed post-tetanic potentiation of twitch tension, associated with increased maximal rate of rise of twitch tension, and in some cases also associated with prolongation of twitch contraction time. A few units showed a short phase of actual depression of the post-tetanic twich responses, followed by potentiation. 3. The time course and magnitude of post-tetanic changes of twitch tension and maximal rate of rise of tension could be described by the sum of three processes which are assumed to be maximal close to the end of the conditioning tetanus: (i) a rapidly declining potentiation (called here early potentiation, which lasted less than 2 sec) which may have a purely mechanical origin; (ii) a much slower-declining potentiation (called here prolonged potentiation, which lasted up to 15 min); and (iii) a process which lasted up to 60 sec during which twitch potentiation was reduced. The latter process (called here depressed potentiation) was usually apparent as a marked trough in the plots of twitch amplitude versus time after the conditioning tetanus, and occassionally was evident as an actual transient depression of twitch amplitude after the tetanus compared with that before. 4. The effects of the prolonged potentiation and the depressed potentiation on the maximal effect of each process close to the end of the tetanus were extracted by fitting single exponential equations to different portions of the data, using a computer program. 5. Twitch potentiation associated with increased maximal rate of rise of tension seemed to be a separate phenomenon to that associated with prolongation of contraction time, seen when conditioning tetani of higher frequency and numbers of stimuli were employed. The depressed potentiation of twitch tension tended to be partly masked in cases where contraction time was prolonged, but this did not affect the depressed potentiation of maximal rate of rise of tension. 6. The post-tetanic potentiation shown by a unit was related to the contraction time of the unit, in addition to the well known relationship to the initial twitch-tetanus ratio. The depressed potentiation may correlat more closely with the initial twitch-tetanus ratio than with the unit contraction time. 7. The magnitude of maximal depressed potentiation shown by a unit may be directly correlated to that of maximal prolonged potentiation. 8. The time constant of decay for prolonged potentiation of twitch tension tended to be related inversely to unit contraction time and directly to unit size and the maximal value of prolonged potentiation oftwitch tension. The time constant of decay for prolonged potentiation of maximal rate of rise of tension tended to be related to unit size and initial twitch-tetanus ratio, and the time constant of decay for depressed potentiation of rate of rise of tension tended to be related to unit size. 9... |
| Ending Page | 554 |
| Starting Page | 535 |
| File Format | |
| ISSN | 14697793 |
| e-ISSN | 14697793 |
| Journal | The Journal of Physiology |
| Volume Number | 276 |
| Language | English |
| Publisher Date | 1978-03-01 |
| Access Restriction | Open |
| Subject Keyword | Research in Higher Education |
| Content Type | Text |
| Resource Type | Article |
| Subject | Physiology Sports Science |
National Digital Library of India (NDLI) is a virtual repository of learning resources which is not just a repository with search/browse facilities but provides a host of services for the learner community. It is sponsored and mentored by Ministry of Education, Government of India, through its National Mission on Education through Information and Communication Technology (NMEICT). Filtered and federated searching is employed to facilitate focused searching so that learners can find the right resource with least effort and in minimum time. NDLI provides user group-specific services such as Examination Preparatory for School and College students and job aspirants. Services for Researchers and general learners are also provided. NDLI is designed to hold content of any language and provides interface support for 10 most widely used Indian languages. It is built to provide support for all academic levels including researchers and life-long learners, all disciplines, all popular forms of access devices and differently-abled learners. It is designed to enable people to learn and prepare from best practices from all over the world and to facilitate researchers to perform inter-linked exploration from multiple sources. It is developed, operated and maintained from Indian Institute of Technology Kharagpur.
Learn more about this project from here.
NDLI is a conglomeration of freely available or institutionally contributed or donated or publisher managed contents. Almost all these contents are hosted and accessed from respective sources. The responsibility for authenticity, relevance, completeness, accuracy, reliability and suitability of these contents rests with the respective organization and NDLI has no responsibility or liability for these. Every effort is made to keep the NDLI portal up and running smoothly unless there are some unavoidable technical issues.
Ministry of Education, through its National Mission on Education through Information and Communication Technology (NMEICT), has sponsored and funded the National Digital Library of India (NDLI) project.
| Sl. | Authority | Responsibilities | Communication Details |
|---|---|---|---|
| 1 | Ministry of Education (GoI), Department of Higher Education |
Sanctioning Authority | https://www.education.gov.in/ict-initiatives |
| 2 | Indian Institute of Technology Kharagpur | Host Institute of the Project: The host institute of the project is responsible for providing infrastructure support and hosting the project | https://www.iitkgp.ac.in |
| 3 | National Digital Library of India Office, Indian Institute of Technology Kharagpur | The administrative and infrastructural headquarters of the project | Dr. B. Sutradhar bsutra@ndl.gov.in |
| 4 | Project PI / Joint PI | Principal Investigator and Joint Principal Investigators of the project |
Dr. B. Sutradhar bsutra@ndl.gov.in Prof. Saswat Chakrabarti will be added soon |
| 5 | Website/Portal (Helpdesk) | Queries regarding NDLI and its services | support@ndl.gov.in |
| 6 | Contents and Copyright Issues | Queries related to content curation and copyright issues | content@ndl.gov.in |
| 7 | National Digital Library of India Club (NDLI Club) | Queries related to NDLI Club formation, support, user awareness program, seminar/symposium, collaboration, social media, promotion, and outreach | clubsupport@ndl.gov.in |
| 8 | Digital Preservation Centre (DPC) | Assistance with digitizing and archiving copyright-free printed books | dpc@ndl.gov.in |
| 9 | IDR Setup or Support | Queries related to establishment and support of Institutional Digital Repository (IDR) and IDR workshops | idr@ndl.gov.in |
|
Loading...
|