Loading...
Please wait, while we are loading the content...
Similar Documents
History of poic capabilities and limitations to conduct international space station payload operations
| Content Provider | NASA Technical Reports Server (NTRS) |
|---|---|
| Author | Horvath, Tim Shell, Mike Morris, Denise Stacy, Lamar Faust, Mark Grimaldi, Rebecca Norwood, Jason Willis, Emily |
| Copyright Year | 2011 |
| Description | Payload science operations on the International Space Station (ISS) have been conducted continuously twenty-four hours per day, 365 days a year beginning February, 2001 and continuing through present day. The Payload Operations Integration Center (POIC), located at the Marshall Space Flight Center in Huntsville, Alabama, has been a leader in integrating and managing NASA distributed payload operations. The ability to conduct science operations is a delicate balance of crew time, onboard vehicle resources, hardware up-mass to the vehicle, and ground based flight control team manpower. Over the span of the last ten years, the POIC flight control team size, function, and structure has been modified several times commensurate with the capabilities and limitations of the ISS program. As the ISS vehicle has been expanded and its systems changed throughout the assembly process, the resources available to conduct science and research have also changed. Likewise, as ISS program financial resources have demanded more efficiency from organizations across the program, utilization organizations have also had to adjust their functionality and structure to adapt accordingly. The POIC has responded to these often difficult challenges by adapting our team concept to maximize science research return within the utilization allocations and vehicle limitations that existed at the time. In some cases, the ISS and systems limitations became the limiting factor in conducting science. In other cases, the POIC structure and flight control team size were the limiting factors, so other constraints had to be put into place to assure successful science operations within the capabilities of the POIC. This paper will present the POIC flight control team organizational changes responding to significant events of the ISS and Shuttle programs. |
| File Size | 748702 |
| Page Count | 12 |
| File Format | |
| Alternate Webpage(s) | http://archive.org/details/NASA_NTRS_Archive_20120001438 |
| Archival Resource Key | ark:/13960/t9091839r |
| Language | English |
| Publisher Date | 2011-09-26 |
| Access Restriction | Open |
| Subject Keyword | Spacecraft Design, Testing And Performance Ground Based Control Allocations International Space Station Control Systems Design Payload Integration Organizations Flight Control Payloads Ntrs Nasa Technical Reports ServerĀ (ntrs) Nasa Technical Reports Server Aerodynamics Aircraft Aerospace Engineering Aerospace Aeronautic Space Science |
| Content Type | Text |
| Resource Type | Article |