Loading...
Please wait, while we are loading the content...
Similar Documents
Lunar surface operations. part 1; post-touchdown lunar surface and system checkouts
| Content Provider | NASA Technical Reports Server (NTRS) |
|---|---|
| Author | Interbartolo, Michael |
| Copyright Year | 2009 |
| Description | This slide presentation reviews the first part of the post-touchdown lunar surface and system checkout tasks. A stay/no stay decision for the lunar lander was made based on the questions: "Is the Lunar Module (LM) stable on the lunar surface?"; "Are there any time critical systems failures or trends indicating impending loss of capability to ascent and achieve a safe lunar orbit?"; and "Is there loss of capability in critical LM systems?" The sequence of these decisions is given as a time after touchdown on the surface of the moon. After the decision to stay is made the next task is to checkout status of the lunar module. While the status of the lunar module is checking out certain conditions, the Command Service Module was also engaged in certain checkout activities. |
| File Size | 972067 |
| Page Count | 50 |
| File Format | |
| Alternate Webpage(s) | http://archive.org/details/NASA_NTRS_Archive_20090016305 |
| Archival Resource Key | ark:/13960/t9p31vr3j |
| Language | English |
| Publisher Date | 2009-01-01 |
| Access Restriction | Open |
| Subject Keyword | Spacecraft Design, Testing And Performance Time Dependence Checkout Command Service Modules Touchdown Apollo Project Lunar Surface Lunar Module Lunar Landing Ntrs Nasa Technical Reports ServerĀ (ntrs) Nasa Technical Reports Server Aerodynamics Aircraft Aerospace Engineering Aerospace Aeronautic Space Science |
| Content Type | Text |
| Resource Type | Presentation |