Loading...
Please wait, while we are loading the content...
Similar Documents
Systems integration processes for nasa ares i crew launch vehicle
| Content Provider | NASA Technical Reports Server (NTRS) |
|---|---|
| Author | Sexton, Jeffrey D. Reuter, James L. Taylor, James L. |
| Copyright Year | 2006 |
| Description | NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable Low Earth Orbit (LEO). This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and nonpropulsion elements within NASA's Crew Launch Vehicle (CLV), now known as the Ares I. The objective of the Ares I is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to LEO in support of the lunar and Mars missions. The Ares I must successfully provide this capability within cost and schedule, and with an acceptable risk approach. This paper will describe the systems engineering management processes that will be applied to assure Ares I Project success through complete and efficient technical integration. Discussion of technical review and management processes for requirements development and verification, integrated design and analysis, integrated simulation and testing, and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The Ares I Project is logically divided into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these Ares I elements and among the other Constellation projects. Also discussed is launch vehicle stack integration (Ares I to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage. The processes for decomposing requirements to the elements and ensuring that requirements have been correctly validated, decomposed, and allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements, will be discussed. |
| File Size | 5215003 |
| Page Count | 12 |
| File Format | |
| Alternate Webpage(s) | http://archive.org/details/NASA_NTRS_Archive_20070002810 |
| Archival Resource Key | ark:/13960/t9m37sq0g |
| Language | English |
| Publisher Date | 2006-01-01 |
| Access Restriction | Open |
| Subject Keyword | Launch Vehicles And Launch Operations Schedules Launch Vehicles Engineering Management Systems Engineering Ground Operational Support System Propulsion Ares 1 Launch Vehicle Design Analysis Systems Integration Payloads Ntrs Nasa Technical Reports ServerĀ (ntrs) Nasa Technical Reports Server Aerodynamics Aircraft Aerospace Engineering Aerospace Aeronautic Space Science |
| Content Type | Text |
| Resource Type | Article |