Loading...
Please wait, while we are loading the content...
Similar Documents
Space station eclss integration analysis
| Content Provider | NASA Technical Reports Server (NTRS) |
|---|---|
| Copyright Year | 1993 |
| Description | The Space Station Environmental Control and Life Support System (ECLSS) contract with NASA MSFC covered the time frame from 9 May 1985 to 31 Dec. 1992. The contract roughly covered the period of Space Station Freedom (SSF) development from early Phase B through Phase C/D Critical Design Review (CDR). During this time, McDonnell Douglas Aerospace-Huntsville (formerly McDonnell Douglas Space Systems Company) performed an analytical support role to MSFC for the development of analytical math models and engineering trade studies related to the design of the ECLSS for the SSF. |
| File Size | 578549 |
| Page Count | 18 |
| File Format | |
| Alternate Webpage(s) | http://archive.org/details/NASA_NTRS_Archive_19930012813 |
| Archival Resource Key | ark:/13960/t3hx6846v |
| Language | English |
| Publisher Date | 1993-01-01 |
| Access Restriction | Open |
| Subject Keyword | Man/system Technology And Life Support Life Support Systems Space Station Freedom Analysis Mathematics Mathematical Models Design Analysis Systems Integration Aerospace Systems Environmental Control Ntrs Nasa Technical Reports ServerĀ (ntrs) Nasa Technical Reports Server Aerodynamics Aircraft Aerospace Engineering Aerospace Aeronautic Space Science |
| Content Type | Text |
| Resource Type | Technical Report |