X-ray satellite (Document No: 19850022832)
| Content Provider | NASA Technical Reports Server (NTRS) |
|---|---|
| Copyright Year | 1985 |
| Description | The projected launch date has been delayed approx. 7 weeks from the planned launch date. The Engineering Model (EM) of the automatic measurement and control system (AMCS) is in the critical phase. The contract change no. 1 to the main contract has been signed. A new version of the welding seam location specifications for the wide field camera (WFC) was proposed by the WFC Consortium. The payload integration plan (PIP) has been signed. Production of the EM/QM prototype and ground station equipment has proceeded according to plan with the exception of some delays. Production of the EM equipment has begun. Preparations for the qualification tests of the EM/QM equipment and the integration of EM equipment has begun. The cause of the delay in the launch date include the combined effects of the postponement of the target date for the EM equipment, along with the fact that only a structural model is available. |
| File Size | 2034980 |
| Page Count | 43 |
| File Format | |
| Alternate Webpage(s) | http://archive.org/details/NASA_NTRS_Archive_19850022832 |
| Archival Resource Key | ark:/13960/t6h17ws1n |
| Language | English |
| Publisher Date | 1985-05-01 |
| Access Restriction | Open |
| Subject Keyword | Spacecraft Design, Testing And Performance Rosat Mission Astronomical Satellites International Cooperation Spaceborne Astronomy Mission Planning Launch Dates X Ray Astronomy X Ray Telescopes Ntrs Nasa Technical Reports ServerĀ (ntrs) Nasa Technical Reports Server Aerodynamics Aircraft Aerospace Engineering Aerospace Aeronautic Space Science |
| Content Type | Text |
| Resource Type | Technical Report |