Loading...
Please wait, while we are loading the content...
External tank processing from barge to pad
| Content Provider | NASA Technical Reports Server (NTRS) |
|---|---|
| Author | Carpenter, J. E. |
| Copyright Year | 1985 |
| Description | Delivery and launch readiness events for the External Tanks (ET) are discussed. The ET is off-loaded at the KSC Barge Turning Basin and towed to the Vertical Assembly Building (VAB), High Bay Transfer Aisle. It is erected vertically and placed in the ET Checkout Area of High Bay 2 or 4 for standalone checkout. At the completion of checkout the ET is transferred to storage or to the Integration Area of High Bay 1 or 3 for SRB and Orbiter Mate. A Systems Integration Test performed with the Orbiter and Solid Rocket Booster is described. Final checkout activities are also described. |
| File Size | 2765284 |
| Page Count | 7 |
| File Format | |
| Alternate Webpage(s) | http://archive.org/details/NASA_NTRS_Archive_19850008618 |
| Archival Resource Key | ark:/13960/t8wb0275w |
| Language | English |
| Publisher Date | 1985-01-01 |
| Access Restriction | Open |
| Subject Keyword | Space Transportation External Tanks Checkout Thermal Protection Propulsion System Performance Systems Engineering Assembling Solid Propellant Rocket Engines Ground Support Equipment Launching Bases Booster Rocket Engines Ntrs Nasa Technical Reports ServerĀ (ntrs) Nasa Technical Reports Server Aerodynamics Aircraft Aerospace Engineering Aerospace Aeronautic Space Science |
| Content Type | Text |
| Resource Type | Article |