Loading...
Please wait, while we are loading the content...
Similar Documents
Integrated guidance, navigation and control verification plan primary flight system. [space shuttle avionics integration
| Content Provider | NASA Technical Reports Server (NTRS) |
|---|---|
| Copyright Year | 1978 |
| Description | The verification process and requirements for the ascent guidance interfaces and the ascent integrated guidance, navigation and control system for the space shuttle orbiter are defined as well as portions of supporting systems which directly interface with the system. The ascent phase of verification covers the normal and ATO ascent through the final OMS-2 circularization burn (all of OPS-1), the AOA ascent through the OMS-1 burn, and the RTLS ascent through ET separation (all of MM 601). In addition, OPS translation verification is defined. Verification trees and roadmaps are given. |
| File Size | 5707000 |
| Page Count | 170 |
| File Format | |
| Alternate Webpage(s) | http://archive.org/details/NASA_NTRS_Archive_19780021201 |
| Archival Resource Key | ark:/13960/t78s9j062 |
| Language | English |
| Publisher Date | 1978-05-01 |
| Access Restriction | Open |
| Subject Keyword | Space Transportation Orbital Mechanics Space Shuttles Proving Spacecraft Control Spacecraft Guidance Data Reduction Avionics Sail Project Computer Programs Ascent Trajectories Ntrs Nasa Technical Reports ServerĀ (ntrs) Nasa Technical Reports Server Aerodynamics Aircraft Aerospace Engineering Aerospace Aeronautic Space Science |
| Content Type | Text |
| Resource Type | Technical Report |