Loading...
Please wait, while we are loading the content...
Similar Documents
Ims/satellite situation center report. predicted orbit plots for hawkeye 1, 1976
| Content Provider | NASA Technical Reports Server (NTRS) |
|---|---|
| Copyright Year | 1975 |
| Description | The predicted orbit plots are shown in three projections. The time period covered by each set of projections is 2 days 1 hour, corresponding approximately to the period of Hawkeye 1. The three coordinate systems used are the Geocentric Solar Ecliptic system (GSE), the Geocentric Solar Magnetospheric system (GSM), and the Solar Magnetic system (SM). For each of the three projections, time ticks and codes are given on the satellite trajectories. The codes are interpreted in the table at the base of each plot. Time is given in the table as year/day/decimal hour. The total time covered by each plot is shown at the bottom of each table, and an additional variable is given in the table for each time tick. For the GSM and SM projection this variable is the geocentric distance to the satellite in earth radii, and for the GSE projection the variable is satellite ecliptic latitude in degrees. |
| File Size | 15223124 |
| Page Count | 192 |
| File Format | |
| Alternate Webpage(s) | http://archive.org/details/NASA_NTRS_Archive_19760008127 |
| Archival Resource Key | ark:/13960/t2b901v9h |
| Language | English |
| Publisher Date | 1975-12-01 |
| Access Restriction | Open |
| Subject Keyword | Astrodynamics Tables Data Satellite Orbits Orbit Calculation Geocentric Coordinates Solar Magnetic Field Graphs Charts Hawkeye Satellites Ntrs Nasa Technical Reports ServerĀ (ntrs) Nasa Technical Reports Server Aerodynamics Aircraft Aerospace Engineering Aerospace Aeronautic Space Science |
| Content Type | Text |
| Resource Type | Technical Report |