Earth resources technology satellite operations control center (occ). erts-b flight activation plan
| Content Provider | NASA Technical Reports Server (NTRS) |
|---|---|
| Copyright Year | 1974 |
| Description | Included in this plan are general objectives through Day 7, operational guidelines and restraints. Following the activation of all subsystems (through Day 3), special series of payload operations were performed to obtain data samples for the different combinations of exposure/gain settings. This took place from Day 4 through Day 7. The Orbit Adjust was employed to perform vernier corrections after the orbit had been defined. The orbit data was collected through Day 3, with the corrections being made from Day 4 through Day 7. ERTS command auxiliary memory (ECAM) was turned on in Day 3 and the memory dumped to a narrow band tape recorder. A verification of memory was done in the off line mode. ECAM was not used in a payload support mode until Day 7. |
| File Size | 3477994 |
| Page Count | 152 |
| File Format | |
| Alternate Webpage(s) | http://archive.org/details/NASA_NTRS_Archive_19750010619 |
| Archival Resource Key | ark:/13960/t3nw47j5g |
| Language | English |
| Publisher Date | 1974-12-31 |
| Access Restriction | Open |
| Subject Keyword | Earth Resources And Remote Sensing Space Vehicle Checkout Program Spacecraft Performance Satellite Orbits Data Acquisition Landsat 2 Spacecraft Launching Payloads Ntrs Nasa Technical Reports ServerĀ (ntrs) Nasa Technical Reports Server Aerodynamics Aircraft Aerospace Engineering Aerospace Aeronautic Space Science |
| Content Type | Text |
| Resource Type | Technical Report |