Please wait, while we are loading the content...
Please wait, while we are loading the content...
| Content Provider | frontiers |
|---|---|
| Author | Cheng, Hui Xu, Chao Jin, Xing Chen, Yigang Zheng, Xu Shi, Feina He, Xudong Hao, Yonggang Jiang, Yun Zhang, Jinhua Chen, Zhicai |
| Abstract | Background: To investigate the association between blood pressure (BP) at the time of recanalization and hemorrhagic transformation in large vessel occlusion (LVO) patients following mechanical thrombectomy (MT) with general anesthesia. Methods: We retrospectively reviewed our data base for patients with AIS who received MT between Jan 2018 and Dec 2019. The BP at two adjacent time points immediately after successful recanalization was recorded for subsequent calculation of mean BP (BPmean), maximum BP (BPmax), minimum BP (BPmin), range of BP (BPrange) and standard deviation of SP (BPSD). Hemorrhagic transformation was identified on 24-hour computerized tomography images according to European Cooperative Acute Stroke Study (ECASS) III trial. We use binary logistic regression analysis to investigate the association of BP parameters and the incidence of parenchymal hemorrhage (PH) and PH-2. Results: A total of 124 patients with anterior circulation LVO were finally included for analyses. After controlling for intravenous thrombolysis, procedure duration of mechanical thrombectomy, baseline NIHSS, baseline ASPECTS, and number of device passes, the results showed that every increment of 10 mmHg in SBPrange (OR 1.559; 95% CI 1.027 to 2.365; P=0.037) and SBPSD (OR 1.998; 95% CI 1.017 to 3.925; P=0.045) were independently associated with PH. After adjustment for intravenous thrombolysis, procedure duration of mechanical thrombectomy, baseline NIHSS, the results showed that every increment of 10 mmHg in SBPmean (OR 1.973; 95% CI 1.190 to 3.271; P =0.008), SBPmax (OR 1.838; 95% CI 1.199 to 2.815; P =0.005), SBPrange (OR 1.908; 95% CI 1.161 to 3.136; P =0.011) and SBPSD (OR 2.573; 95% CI 1.170 to 5.675; P =0.019) were independently associated with PH-2. Conclusion: Patients with higher systolic BP and variability at the time of successful recanalization were more likely to have PH-2 in LVO patients following MT with general anesthesia. |
| ISSN | 16642295 |
| DOI | 10.3389/fneur.2020.582639 |
| Volume Number | 11 |
| Journal | Frontiers in Neurology |
| Language | English |
| Publisher Date | 2020-11-17 |
| Access Restriction | Open |
| Subject Keyword | Blood Pressure Hemorrhagic transformation Mechanical thrombectomy Recanalization Large artery occlusion |
| Content Type | Text |
| Resource Type | Article |
| Subject | Neurology Neurology (clinical) |
National Digital Library of India (NDLI) is a virtual repository of learning resources which is not just a repository with search/browse facilities but provides a host of services for the learner community. It is sponsored and mentored by Ministry of Education, Government of India, through its National Mission on Education through Information and Communication Technology (NMEICT). Filtered and federated searching is employed to facilitate focused searching so that learners can find the right resource with least effort and in minimum time. NDLI provides user group-specific services such as Examination Preparatory for School and College students and job aspirants. Services for Researchers and general learners are also provided. NDLI is designed to hold content of any language and provides interface support for 10 most widely used Indian languages. It is built to provide support for all academic levels including researchers and life-long learners, all disciplines, all popular forms of access devices and differently-abled learners. It is designed to enable people to learn and prepare from best practices from all over the world and to facilitate researchers to perform inter-linked exploration from multiple sources. It is developed, operated and maintained from Indian Institute of Technology Kharagpur.
Learn more about this project from here.
NDLI is a conglomeration of freely available or institutionally contributed or donated or publisher managed contents. Almost all these contents are hosted and accessed from respective sources. The responsibility for authenticity, relevance, completeness, accuracy, reliability and suitability of these contents rests with the respective organization and NDLI has no responsibility or liability for these. Every effort is made to keep the NDLI portal up and running smoothly unless there are some unavoidable technical issues.
Ministry of Education, through its National Mission on Education through Information and Communication Technology (NMEICT), has sponsored and funded the National Digital Library of India (NDLI) project.
| Sl. | Authority | Responsibilities | Communication Details |
|---|---|---|---|
| 1 | Ministry of Education (GoI), Department of Higher Education |
Sanctioning Authority | https://www.education.gov.in/ict-initiatives |
| 2 | Indian Institute of Technology Kharagpur | Host Institute of the Project: The host institute of the project is responsible for providing infrastructure support and hosting the project | https://www.iitkgp.ac.in |
| 3 | National Digital Library of India Office, Indian Institute of Technology Kharagpur | The administrative and infrastructural headquarters of the project | Dr. B. Sutradhar bsutra@ndl.gov.in |
| 4 | Project PI / Joint PI | Principal Investigator and Joint Principal Investigators of the project |
Dr. B. Sutradhar bsutra@ndl.gov.in Prof. Saswat Chakrabarti will be added soon |
| 5 | Website/Portal (Helpdesk) | Queries regarding NDLI and its services | support@ndl.gov.in |
| 6 | Contents and Copyright Issues | Queries related to content curation and copyright issues | content@ndl.gov.in |
| 7 | National Digital Library of India Club (NDLI Club) | Queries related to NDLI Club formation, support, user awareness program, seminar/symposium, collaboration, social media, promotion, and outreach | clubsupport@ndl.gov.in |
| 8 | Digital Preservation Centre (DPC) | Assistance with digitizing and archiving copyright-free printed books | dpc@ndl.gov.in |
| 9 | IDR Setup or Support | Queries related to establishment and support of Institutional Digital Repository (IDR) and IDR workshops | idr@ndl.gov.in |
|
Loading...
|