Please wait, while we are loading the content...
Please wait, while we are loading the content...
| Content Provider | EDP Sciences |
|---|---|
| Author | Marina Cavazzana-Calvo Isabelle André-Schmutz Salima Hacein-Bey John Schindler Hélène Vitetta Sophie Dupuis Pierre Quartier Gaëlle Chedeville Étienne Vilmer Jean-Laurent Casanova Renaud Buffet Sophie Caillat-Zucman Isabelle Radford Françoise Le Deist Alain Fischer |
| Abstract | A l’heure actuelle, l’absence de compatibilité HLA lors d’une greffe de cellules hématopoïétiques souches (CHS) est responsable d’un taux d’échec important, en raison, entre autres, de l’immunodéficience prolongée qui favorise les rechutes et les infections. Pour pallier ce déficit prolongé, il serait théoriquement possible d’injecter après la greffe des lymphocytes T du donneur mais le risque de provoquer une réaction du greffon contre l’hôte léthale (GVHD) rend cette option irréalisable. La stratégie que nous avons développée consiste, avant d’injecter les lymphocytes T, à éliminer ceux d’entre eux qui sont alloréactifs à l’aide d’une immunotoxine spécifique pour la chaîne p55 du récepteur de l’IL-2, exprimée par les lymphocytes T activés dans une culture mixte lymphocytaire (CML). Treize patients ont été inclus dans un protocole de ph ase I/II depuis septembre 1998. L’un d’entre eux a reçu deux greffes. Ces patients dont la moyenne d’âge à l’inclusion est de 17 mois, sont atteints soit d’hémopathies malignes (LAL ou LAM), soit de déficits immunitaires, et ne disposent pas d’un donneur familial géno-identique. Les lymphocytes T allodéplétés ont été injectés entre 14 et 30 jours postgreffe, dès la sortie d’aplasie, aux doses de 100 000 (n = 3), 400 000 (n = 7) et 600 000 lymphocytes T/kg (n = 4). La déplétion des lymphocytes T alloréactifs a été complète dans 12 manipulations sur 14 avec moins de 1 % de prolifération résiduelle. Dans 2 cas, cette prolifération résiduelle était de 4 et 5 % (un patient dans le groupe 400 000 et l’autre dans le groupe 600 000 cellules). Au total, 4 patients ont développé une GVH aiguë (a) de grade I à II exclusivement, dont les deux patients pour lesquels la déplétion était incomplète. Aucune de ces GVHa n’a évolué en GVH chronique. Six patients sont décédés de maladies veino-occlusives (MVO) (n = 3), d’une méningoencéphalite due à une infection par le virus varicella-zooster (VZV) déjà présente avant la greffe (n = 1), d’une rechute de LAL (n =1) et d’une infection à Staphylocoque (n = 1). A l’heure actuelle, la survie est de 54 % pour un suivi moyen de 8 mois (3,5 à 22 mois).Du point de vue immunologique, sur 11 greffes évaluables, une moyenne de 63 jours a été nécessaire pour présenter 300 CD3/µl, 97 jours pour 200 CD4/µl et 90 jours pour détecter une réponse positive aux mitogènes. Trois patients ont présenté une réponse proliférative positive en présence de la toxine tétanique avant d’être vaccinés. Cette analyse intermédiaire suggère que 1) la déplétion alloréactive ex vivo permet d’empêcher efficacement le développement de la GVH dans un contexte d’incompatibilité HLA majeur, 2) que les lymphocytes T réinjectés sont capables de survivre et de s’expandre. |
| Ending Page | 68 |
| Starting Page | 65 |
| Page Count | 4 |
| File Format | HTM / HTML PDF |
| ISSN | 12950661 |
| Alternate Webpage(s) | https://www.biologie-journal.org/articles/jbio/abs/2001/01/jbio200119501p65/jbio200119501p65.html |
| e-ISSN | 17606128 |
| Issue Number | 1 |
| Journal | Journal de la Société de Biologie |
| Volume Number | 195 |
| DOI | 10.1051/jbio/2001195010065 |
| Language | French |
| Publisher | EDP Sciences |
| Publisher Date | 2001-01-01 |
| Access Restriction | Subscribed |
| Rights Holder | © Société de Biologie, Paris, 2001 |
| Content Type | Text |
| Resource Type | Article |
| Subject | Cell Biology Aging |
National Digital Library of India (NDLI) is a virtual repository of learning resources which is not just a repository with search/browse facilities but provides a host of services for the learner community. It is sponsored and mentored by Ministry of Education, Government of India, through its National Mission on Education through Information and Communication Technology (NMEICT). Filtered and federated searching is employed to facilitate focused searching so that learners can find the right resource with least effort and in minimum time. NDLI provides user group-specific services such as Examination Preparatory for School and College students and job aspirants. Services for Researchers and general learners are also provided. NDLI is designed to hold content of any language and provides interface support for 10 most widely used Indian languages. It is built to provide support for all academic levels including researchers and life-long learners, all disciplines, all popular forms of access devices and differently-abled learners. It is designed to enable people to learn and prepare from best practices from all over the world and to facilitate researchers to perform inter-linked exploration from multiple sources. It is developed, operated and maintained from Indian Institute of Technology Kharagpur.
Learn more about this project from here.
NDLI is a conglomeration of freely available or institutionally contributed or donated or publisher managed contents. Almost all these contents are hosted and accessed from respective sources. The responsibility for authenticity, relevance, completeness, accuracy, reliability and suitability of these contents rests with the respective organization and NDLI has no responsibility or liability for these. Every effort is made to keep the NDLI portal up and running smoothly unless there are some unavoidable technical issues.
Ministry of Education, through its National Mission on Education through Information and Communication Technology (NMEICT), has sponsored and funded the National Digital Library of India (NDLI) project.
| Sl. | Authority | Responsibilities | Communication Details |
|---|---|---|---|
| 1 | Ministry of Education (GoI), Department of Higher Education |
Sanctioning Authority | https://www.education.gov.in/ict-initiatives |
| 2 | Indian Institute of Technology Kharagpur | Host Institute of the Project: The host institute of the project is responsible for providing infrastructure support and hosting the project | https://www.iitkgp.ac.in |
| 3 | National Digital Library of India Office, Indian Institute of Technology Kharagpur | The administrative and infrastructural headquarters of the project | Dr. B. Sutradhar bsutra@ndl.gov.in |
| 4 | Project PI / Joint PI | Principal Investigator and Joint Principal Investigators of the project |
Dr. B. Sutradhar bsutra@ndl.gov.in Prof. Saswat Chakrabarti will be added soon |
| 5 | Website/Portal (Helpdesk) | Queries regarding NDLI and its services | support@ndl.gov.in |
| 6 | Contents and Copyright Issues | Queries related to content curation and copyright issues | content@ndl.gov.in |
| 7 | National Digital Library of India Club (NDLI Club) | Queries related to NDLI Club formation, support, user awareness program, seminar/symposium, collaboration, social media, promotion, and outreach | clubsupport@ndl.gov.in |
| 8 | Digital Preservation Centre (DPC) | Assistance with digitizing and archiving copyright-free printed books | dpc@ndl.gov.in |
| 9 | IDR Setup or Support | Queries related to establishment and support of Institutional Digital Repository (IDR) and IDR workshops | idr@ndl.gov.in |
|
Loading...
|