Loading...
Please wait, while we are loading the content...
Similar Documents
Ags upgrade to 1-mw with a super-conducting linac injector*.
| Content Provider | CiteSeerX |
|---|---|
| Abstract | It has been proposed to upgrade the Alternating Gradient Synchrotron (AGS) accelerator complex at the Brookhaven National Laboratory (BNL) to provide an average proton beam power of 1 MW at the energy of 28 GeV. The facility is to be primarily used as a proton driver for the production of intense neutrino beams [1]. This paper reports on the feasibility study of a proton Super-Conducting Linac (SCL) as a new injector to the AGS. The Linac beam energy is 1.2 GeV. The beam intensity is adjusted to provide the required average beam power of 1 MW at 28 GeV. The repetition rate of the SCL-AGS facility is 2.5 beam pulses per second. |
| File Format | |
| Access Restriction | Open |
| Subject Keyword | Intense Neutrino Beam Alternating Gradient Synchrotron Scl-ags Facility Required Average Beam Power Accelerator Complex Proton Super-conducting Linac New Injector Beam Intensity Linac Beam Energy Brookhaven National Laboratory Feasibility Study Repetition Rate Beam Pulse Average Proton Beam Power Proton Driver |
| Content Type | Text |
| Resource Type | Article |