Loading...
Please wait, while we are loading the content...
Similar Documents
SIM-SERV Case study: Simulation-Based Production Planning and Capacity Optimisation (2004)
| Content Provider | CiteSeerX |
|---|---|
| Author | Merkuryeva, Galina Shires, Nigel |
| Description | The simulation tools developed to support customised solving of a production scheduling and capacity optimisation problem for medium-sized UK based company are presented. The improvements of the simulation-based scheduling approach and its benefits in practice are given. Decorpart case study presented in the paper was developed within Sim-Serv Thematic Network project ‘Virtual Institute on Production-Oriented Simulation ’ under the EU-funded GROWTH research programme. Proceedings of 18 th European Simulation Multiconference |
| File Format | |
| Language | English |
| Publisher Date | 2004-01-01 |
| Access Restriction | Open |
| Subject Keyword | Simulation-based Scheduling Approach Simulation Tool Sim-serv Thematic Network Production-oriented Simulation Eu-funded Growth Research Programme Medium-sized Uk Customised Solving Simulation-based Production Planning Virtual Institute Production Scheduling Sim-serv Case Study Decorpart Case Study Capacity Optimisation Problem Capacity Optimisation |
| Content Type | Text |
| Resource Type | Article |