| Content Provider | The American Society of Mechanical Engineers (ASME) Digital Collection |
|---|---|
| Author | Andrew, F. Morton Keneipp, Dan Altasserre, Antoine |
| Copyright Year | 2011 |
| Abstract | AREVA Solar, Inc. constructed, commissioned and operated the first-of-its-kind Once Through Solar Steam Generator (OTSG SSG), SSG4 at the Kimberlina Solar Thermal Power Station. The construction and commissioning of SSG4 was completed in September 2010, culminating in the successful execution of a series of performance tests. This was the first SSG that AREVA Solar, Inc. designed, manufactured and constructed to comply with ASME Section I, and registered with the National Board. SSG4 is the first in its class that produces high-pressure, superheated steam in a once through configuration. Some aspects of the system presented unique commissioning and operational challenges that are not commonly found in conventional fired boilers. These include: i) the use of a first-in-class model predictive control (MPC) system; ii) a steam integration system to blend steam from the once-through superheated SSG4 and the previous-generation, saturated steam SSGs; iii) a steam handling system that delivers the steam to a turbine generator or to a dump condenser; iv) precision optical tracking that is required for optimal boiler performance; v) 1310ft (400 meter) long boiler tube bundle. Unique for field erected boilers, the SSG4 tube bundle was welded at grade. After being inspected, the receiver and tube bundle support structure was placed over the bundles, secured and the entire receiver structure, with boiler tubes, was hoisted to its operating position, 60ft (18m) above grade. Following final connections of feedwater and steam piping, the boiler was inspected by Hartford Steam Boiler Insurance Company, which included hydrostatic test pressurization to 2002.5 psi (13.8MPa), and the stamps were applied to the boiler nameplate (see Figure 1 for a photo of the SSG4 boiler nameplate). Commissioning included standard boiler flushing and tube cleaning program and a comprehensive set of pre-operational tests. There were additional requirements that are unique to Compact Linear Fresnel Reflector (CLFR) solar thermal systems such as reflector alignment and tuning. These and other commissioning activities were scheduled around a constraint unique to solar systems — the availability of sunlight. A comprehensive set of procedures was followed to enable safe and successful integration and commissioning of the model predictive control system. Upon completion of commissioning, the plant was turned over to operations for continued testing. Stable superheated steam delivery was achieved within one week of Mechanical Completion, and Acceptance Testing was completed two weeks later at levels that exceeded the guarantee. This paper will describe the details of the integration, construction and commissioning milestones, distinctive aspects of commissioning solar thermal systems, and organization of the commissioning team to achieve success. |
| Sponsorship | Power Division |
| Starting Page | 47 |
| Ending Page | 54 |
| Page Count | 8 |
| File Format | |
| ISBN | 9780791844601 |
| DOI | 10.1115/POWER2011-55193 |
| Volume Number | ASME 2011 Power Conference, Volume 2 |
| Conference Proceedings | ASME 2011 Power Conference collocated with JSME ICOPE 2011 |
| Language | English |
| Publisher Date | 2011-07-12 |
| Publisher Place | Denver, Colorado, USA |
| Access Restriction | Subscribed |
| Subject Keyword | Construction Superheating Condensers (steam plant) Turbogenerators Boilers Boiler tubes Thermal systems High pressure (physics) Insurance Solar energy Steam Feedwater Hydrostatic testing Sunlight Testing performance Solar thermal power Teams Pipes Predictive control Testing |
| Content Type | Text |
| Resource Type | Article |
National Digital Library of India (NDLI) is a virtual repository of learning resources which is not just a repository with search/browse facilities but provides a host of services for the learner community. It is sponsored and mentored by Ministry of Education, Government of India, through its National Mission on Education through Information and Communication Technology (NMEICT). Filtered and federated searching is employed to facilitate focused searching so that learners can find the right resource with least effort and in minimum time. NDLI provides user group-specific services such as Examination Preparatory for School and College students and job aspirants. Services for Researchers and general learners are also provided. NDLI is designed to hold content of any language and provides interface support for 10 most widely used Indian languages. It is built to provide support for all academic levels including researchers and life-long learners, all disciplines, all popular forms of access devices and differently-abled learners. It is designed to enable people to learn and prepare from best practices from all over the world and to facilitate researchers to perform inter-linked exploration from multiple sources. It is developed, operated and maintained from Indian Institute of Technology Kharagpur.
Learn more about this project from here.
NDLI is a conglomeration of freely available or institutionally contributed or donated or publisher managed contents. Almost all these contents are hosted and accessed from respective sources. The responsibility for authenticity, relevance, completeness, accuracy, reliability and suitability of these contents rests with the respective organization and NDLI has no responsibility or liability for these. Every effort is made to keep the NDLI portal up and running smoothly unless there are some unavoidable technical issues.
Ministry of Education, through its National Mission on Education through Information and Communication Technology (NMEICT), has sponsored and funded the National Digital Library of India (NDLI) project.
| Sl. | Authority | Responsibilities | Communication Details |
|---|---|---|---|
| 1 | Ministry of Education (GoI), Department of Higher Education |
Sanctioning Authority | https://www.education.gov.in/ict-initiatives |
| 2 | Indian Institute of Technology Kharagpur | Host Institute of the Project: The host institute of the project is responsible for providing infrastructure support and hosting the project | https://www.iitkgp.ac.in |
| 3 | National Digital Library of India Office, Indian Institute of Technology Kharagpur | The administrative and infrastructural headquarters of the project | Dr. B. Sutradhar bsutra@ndl.gov.in |
| 4 | Project PI / Joint PI | Principal Investigator and Joint Principal Investigators of the project |
Dr. B. Sutradhar bsutra@ndl.gov.in Prof. Saswat Chakrabarti will be added soon |
| 5 | Website/Portal (Helpdesk) | Queries regarding NDLI and its services | support@ndl.gov.in |
| 6 | Contents and Copyright Issues | Queries related to content curation and copyright issues | content@ndl.gov.in |
| 7 | National Digital Library of India Club (NDLI Club) | Queries related to NDLI Club formation, support, user awareness program, seminar/symposium, collaboration, social media, promotion, and outreach | clubsupport@ndl.gov.in |
| 8 | Digital Preservation Centre (DPC) | Assistance with digitizing and archiving copyright-free printed books | dpc@ndl.gov.in |
| 9 | IDR Setup or Support | Queries related to establishment and support of Institutional Digital Repository (IDR) and IDR workshops | idr@ndl.gov.in |
|
Loading...
|